Fabien CharneuxHands-on notes on operations and projectsFrançais

Experience

Experience, scope and track record

Roles, scope by role, results and skills, as recorded. Figures are labelled as recorded results, delivered work or work in pilot.

At a glance

General Manager with seven years leading operations in China and Vietnam. Largest P&L so far: a €20M plant of up to 150 people. Led the sale of a plant through to closing and brought three acquired plants onto one production system. Glad to compare notes with groups that run several sites in Asia.

What I bring

Strengths

How my scope grew, role by role

The size of the business moved less than the shape of my role: from matrix project teams, to a department of direct reports, to a group function, to a country with its own management team. Responsibility for capital and revenue peaked in the project years (€80M equivalent revenue, €30M CAPEX through six project managers); full P&L accountability began in China. Figures are as recorded on each role’s page.

PeriodRolePeople ledTypeScope
2004–2010Project Manager, SNOPMatrix project teams of 10 to 20Portfolio€30–50M annual revenue, €10–30M CAPEX
2010–2013Industrial Project Manager, plant integration3 acquired plants, 200 employeesIntegration€60M combined revenue
2013–2017Projects Section & Prototype Department Manager6 project managers, directPortfolio€80M equivalent annual revenue, €30M CAPEX
2017–2019Innovation & Technical Cost Reduction Director10 direct reports, 40 in matrixBudget€10M budget, group-wide
2019–2024General Manager, SNOP China7 direct reports, up to 150 peopleP&L2 legal entities and a sales office: €20M plant revenue, about €15M (120M CNY) a year sourced for sister plants
2024–presentGeneral Manager, FFG Bags12 direct reports, about 150 peopleP&LFactory of about 150 people, revenue up 20–25 % in two years

Leading leaders and teams

Led the China business through seven direct reports and a plant of up to 150 people, a young factory in Vietnam through twelve, a group innovation function of ten direct reports and 40 people in matrix, and a department of six project managers, alongside multicultural project teams serving Nissan, Renault and Tier 1 customers. The method is the same everywhere: managers who coach rather than control, clear communication, and shared moments that hold a group together, including through Covid and the sale of the China plant.

Organisation

Processes over individual know-how: integrated three acquired plants into a group production system and SAP, built an innovation function, and now structure a growing factory from customer inquiry to delivery.

Technical, product and process expertise

Mechanical engineer by training. Stamping and welding, industrialisation, lean (QRQC, Kaizen, SMED), technical cost reduction, and today technical bags for defense, outdoor and industrial markets.

Data and AI-enabled operations

Turning operational data into shared tools: in-house sensors on stitching machines, equipment registers, costing models, KPI reviews and AI-assisted workflows, deployed with clear human approval at each step.

Safety and quality

As General Manager in China and now at FFG in Vietnam: no major accident, and about two minor incidents a year on average. I know the ISO and IATF requirements well, though I did not deploy or manage those systems myself. Where I am most experienced is the OEM supplier audits such as ASES, the Renault and Nissan assessment, which is far more technical and precise than the general standards.

Beyond a single plant

My largest P&L so far is a plant of up to 150 people and €20M of revenue. A group with several sites is a different job, so here is what I have already done beyond a single plant, and what I have not.

Leading through managers

In China I led two legal entities and a Shanghai sales office through seven direct reports. In the group innovation function I led ten direct reports and forty people in matrix, and before that six project managers carrying €80M of equivalent annual revenue.

Several sites at once

I brought three acquired plants, 200 people and €60M of combined revenue, onto one production system and SAP. From China I also handled about €15M a year of tooling and equipment purchasing for European sister plants.

Group strategy into a local plan

I translated the group strategy into the local business plan and owned the P&L against it.

A successor I had developed

My successor in China had been a project manager in my team in France. He moved to a project team management role in China before I arrived as General Manager, and he stepped into my role when I left.

What I have not done

I have not run a P&L across several plants. In such a job I would lead through country managers, and spend the first months with customers, suppliers and the existing leadership before changing anything.

Career at a glance
  1. 2024–presentGeneral Manager, FFG Bags
  2. 2019–2024General Manager, SNOP China
  3. 2017–2019Innovation Director
  4. 2016–2019President, FSD Participations
  5. 2013–2017Projects & Prototypes Manager
  6. 2010–2013Integration Project Manager
  7. 2004–2010Project Manager

Track record

Key accomplishments

Recorded result

€20M plant revenue, up to 150 people

Ran SNOP's China business

SNOP China, Guangzhou, 2019–2024

Full P&L for a Tier 1 stamping and welding plant and a tooling engineering and purchasing company handling about €15M (120M CNY) a year for European sister plants, plus a sales office in Shanghai, led through seven direct reports. Continuous improvement delivered 3–5 % productivity gains.

Annual volume, €M
General managementChinaP&L

Recorded result

M&A sell-side process, led through to closing

Led the sale of the China plant

SNOP China, after a group strategic reorganisation

Led the process with group headquarters, key stakeholders, lawyers and private bankers, met potential investors from the United States, China and elsewhere, and represented the company. Oversaw due diligence, negotiation and transaction documents, and led staff communication for a smooth handover. The buyer came from the same industry and every employee transferred with the plant.

M&ADivestmentChange management

Recorded result

+20–25 % revenue in two years

Grew revenue with a sharper commercial offer

FFG Bags, 2024–2026

Rebuilt the website for search and AI answer engines, and clarified the development offer so that the team’s time goes to serious, well-defined projects.

Revenue index, start of the two years = 100
Revenue growthBusiness developmentSEO and AEO

Recorded result

C → B BSCI grade, Feb. 2025

Raised the social-audit record

FFG Bags, renewed at Grade B in March 2026

A company and team result during my tenure: the factory moved from Grade C to an overall Grade B and held it at the next audit, a prerequisite for many international brands.

amfori BSCI audit grade, from A (best) to E
BSCIResponsible manufacturing

Source ↗

Recorded result

Won the first customer for a new product range

FFG Bags

A new product range for the factory, and a first customer for it. The first contact came through LinkedIn. The customer answered with strict, short-term milestones and several requirements outside our usual pattern. We committed to meeting them, showed our seriousness through video calls and demonstrations, and secured the collaboration. Face-to-face visits strengthened it afterwards.

Business developmentNew marketsCustomer trust

Recorded result

4–6 % cost reduction a year

Group-wide technical cost reduction

SNOP group, 2017–2019

€10M budget, 10 direct reports and 40 people in matrix. Re-engineering, product-complexity reduction and supply-chain reviews, while building the group’s innovation function from scratch.

Technical cost reduction, share of cost per year
Cost reductionInnovation

Recorded result

+6 % operating profit, nomination to buy-off

Profit growth on the Nissan and Tier 1 portfolio

Projects section, 2013–2017

€30M CAPEX and €80M equivalent annual revenue, managed through six project managers and KPI discipline.

Operating profit index, at nomination = 100
P&LProject management

Recorded result

+10 % OEE over 3 years

Integrated three acquired plants

Wagon Automotive integration, 2010–2013

Three plants, 200 employees and €60M revenue brought onto the SNOP production system and SAP, with weekly workshops and monthly lean events.

OEE index, start = 100
Post-acquisition integrationLeanSAP

Recorded result

×10+ inbound enquiries

Made the factory findable by buyers and AI assistants

FFG Bags, last three months

The rebuilt website now brings buyers to the factory through search engines and AI assistants. The surge in demand led to a lead-management workflow with AI-assisted data capture and analysis, so the team handles a much higher volume without a proportional rise in work.

SEO and AEOLead generationAI

Career

Experience

  1. Sept. 2024 – present

    General Manager · FFG Bags

    Ho Chi Minh City area (Dong Nai factory), Vietnam

    French-led B2B manufacturer of technical bags for international brands: defense, outdoor, urban carry, industrial and medical. Part of a group founded in Hong Kong in 2003, with sixteen years of production in China before moving to Vietnam: company set up in 2020, factory operating since 2023, about 150 people with twelve direct reports, and a monthly output in the tens of thousands of pieces. Revenue up 20–25 % in two years. Mandate: move a small, people-dependent operation onto processes, data and management systems that can carry steady growth.

    • First 90 days. Took over a fast-moving organisation built on individual expertise and put the first structure in place within three months: clearer communication channels, regular management meetings, a first customer-acquisition plan, production monitoring in the annual action plan, and a new website with a refined external message.
    • Strategy and business development. Refined the business plan, development strategy and business model. Clarified the development offer so that the team’s time goes to serious, well-defined projects. Rebuilt the website for search engines and AI answer engines (SEO and AEO). Inbound enquiries rose more than tenfold. Deployed marketing, CRM and PLM tools. Presented the factory’s technical capabilities at Global Sourcing Fair Vietnam and Outdoor Retailer + ODI 2025, backed by bilingual English and French buyer resources.
    • A first customer for a new product range. The first contact came through LinkedIn, a channel that rarely produces leads for us. The customer replied with strict, short-term milestones and requirements outside our usual pattern. We chose to meet them, showed our seriousness through video calls and demonstrations, and secured the collaboration, later strengthened by face-to-face visits.
    • An adjacent market: FFG Industrial. Customer requests for parts beyond the bag (buckles, foam padding, fitted cases, boxes) were read as a market signal. The answer is FFG Industrial, a dedicated engineering offer and brand launched in September 2026 on the factory’s shared team and resources, which helps European and North American SMEs define and source foam, plastic, metal and multi-material parts in Asia. Delivered so far: an FFG-developed rotating buckle, custom foam padding and custom boxes; more projects are in progress.
    • Responsible manufacturing and standards. BSCI social-audit grade raised from C to B in February 2025 and renewed at B in March 2026, through reinforced workflows and documentation and a stronger consideration of every stakeholder’s interests, employees and partners first. Buyers mainly ask for the BSCI result, shared openly and verifiable on the auditor’s platform, and for factory visits, accepted at any time. NCAGE supplier registration (code SSVR1) obtained in July 2025, supporting customers who bid for public defence tenders. Progressive deployment of ISO 9001, WRAP and SA8000 requirements.
    • Factory and lean. Lean, Kaizen and 5S on the shop floor. A new automatic cutting machine added in December 2025, warehouse racking and floor-safety improvements. Factory skills matrix and training plans. Equipment register with machine QR codes and maintenance records. In-house sensors on the stitching machines measure how much each machine runs, a proxy that helps managers spot bottlenecks and machine trouble in sewing lines of up to 40 operators (pilot).
    • Cost and management systems. Cost-structure analysis, budgets and performance dashboards. ERP refocused on core processes. Design-to-cost and design-for-manufacturing applied to new products.
    • Digital operations with data and AI. A lead-management workflow with AI-assisted data capture and analysis, built to absorb a much higher volume of enquiries without adding staff work. Guiding rule: each piece of information is entered once, then reused and tracked. Piloting a structured inquiry-to-approved-sample workflow and Pre-BOM, sourcing and material-availability workspaces, with a human approval at each decision step.
    General ManagerTechnical bagsSoft goodsVietnamBSCILeanDigital transformationAI
  2. Mar. 2019 – Aug. 2024

    General Manager · SNOP China (Groupe FSD)

    Guangzhou, China

    Ran the group's business in China through two legal entities, a Tier 1 automotive parts plant and a tooling engineering and purchasing company, plus a sales office in Shanghai, with seven direct reports. Then led the sale of the plant after a group-level strategic reorganisation.

    • Scope. Two legal entities (each with its own accounting and authorities) and a Shanghai sales office, seven direct reports, up to 150 people. €20M plant revenue, plus about €15M (120M CNY) a year of tooling and equipment sourced for European sister plants.
    • General management. Translated group strategy into the local business plan and owned the P&L. Set performance objectives and an entrepreneurial way of working. Defined the local sales and marketing strategy.
    • Operations. Supervised supply chain, production, maintenance, engineering, HSE and HR on the floor and through dashboards built on standards, ERP and BI. Continuous-improvement plans delivered 3–5 % productivity gains.
    • Through Covid and the automotive downturn. Built on the strong team spirit of a plant opened in 2012. Mobilised the team to win more local customers, cut costs and expenses wherever possible, and kept team-building going to hold the collective together.
    • Divestment. Following the group decision, ran the plant sale through to closing. Led the process in coordination with group headquarters and key stakeholders, lawyers and private bankers; met potential investors from the United States, China and elsewhere, and represented the company. Oversaw due diligence, negotiation and transaction documents. Led staff communication and negotiations for a smooth handover. The buyer came from the same industry and every employee transferred with the plant.
    • Group interface. Counterpart of the group VPs for operations, finance, engineering, sales and projects.
    General ManagerP&LM&A divestmentAutomotive Tier 1ChinaStamping and welding
  3. Sept. 2017 – Mar. 2019

    Innovation & Technical Cost Reduction Director · SNOP (Groupe FSD)

    Paris region, France

    Created the group's innovation function and led group-wide technical cost reduction, aligned with customer expectations and the long-term strategy.

    • Scope. €10M budget, 10 direct reports, matrix management of 40 people.
    • Innovation. Defined the innovation strategy, budgets (CAPEX, OPEX) and resource allocation for top-management approval. Ran technology and market watch and competitor benchmarks. Led projects in warm aluminium forming, in-line laser stripping and welding on roll-forming lines, hot stamping, IoT and AGVs.
    • Cost reduction. Launched re-engineering, product-complexity reduction, logistics and supply-chain reviews, delivering 4–6 % cost reduction a year.
    • Most advanced project. Warm-to-hot forming of 6000-series aluminium, alloys that are hard to stamp but offer very high properties for car bodies. A two-year study with Renault and Constellium led to a pilot project, which continued after the move to China.
    • Ecosystem. Managed relations with partners and suppliers, trade shows and conferences, regulatory changes and subsidy programmes.
    InnovationCost reductionMatrix managementIndustry 4.0
  4. Sept. 2016 – Feb. 2019

    President (alongside operational roles) · FSD Participations

    France

    Chaired the management committee of the company holding employee shareholding in the FSD group, owner of SNOP, SNWM, SMOM and their foreign subsidiaries.

    • Ran day-to-day administration and share movements.
    • Internal communication and promotion grew the number of employee shareholders by 20 % in three years.
    • Prepared and presented the ordinary and extraordinary general meetings, accounts and annual report with the statutory auditor. Represented the shareholders at the group’s general meeting.
    GovernanceEmployee shareholdingCorporate finance
  5. May 2013 – Aug. 2017

    Projects Section & Prototype Department Manager · SNOP (Groupe FSD)

    Paris region, France

    Managed two departments: customer projects for Nissan (UK, Russia, Japan), Renault and Dacia, and Tier 1 customers such as Valeo, Forvia/Faurecia and NTN, and the prototype department supplying all group vehicle programmes.

    • Scope. €30M CAPEX and €80M equivalent annual revenue. Six project managers reporting directly.
    • Results. +6 % operating profit between nomination and final buy-off across the portfolio.
    • Prototypes. Parts for the pre-project phases of every group vehicle programme: design counter-analysis, crash tests and OEM assembly-line trials.
    • Leadership. Appointed and coached project managers by workload, customer specifics and risk. Matrix relations with R&D, engineering, quality and logistics, and with sales to align customer and company interests.
    Project managementNissanCAPEXPrototypesOperating profit
Earlier roles, 2004–2013
  1. Feb. 2010 – Apr. 2013

    Industrial Project Manager — Post-acquisition integration · SNOP (Groupe FSD), ex Wagon Automotive plants

    Paris, France

    Integrated a newly acquired company of three French plants into the group's processes, production system and ERP.

    • Scope. 3 plants, 200 employees, €60M combined annual revenue.
    • Deployed the SNOP production system: QRQC, 8D, Kaizen, 5S, SMED, with monthly lean events and weekly plant workshops. OEE improved by about 10 % over three years.
    • Supported the replacement of the legacy ERP by SAP.
    • Benchmarked operational efficiency and internal costs to drive improvement plans. Built competence assessment and training plans with HR.
    Post-acquisition integrationLean manufacturingSAPChange managementOEE
  2. Oct. 2004 – Feb. 2010

    Project Manager · SNOP (Groupe FSD)

    Paris, France

    Joined SNOP, an automotive stamping and assembly group that went on to grow from about €630M of revenue in 2010 to €1.85bn in 2024, with more than 8,000 people at its peak and a place among Europe's Tier 1 leaders.

    • Scope. €30–50M annual revenue and €10–30M CAPEX under direct responsibility, matrix project teams of 10 to 20.
    • Led projects for Nissan, Renault, Dacia, Dura and others through quality, cost and delivery (QCD) management, from nomination to series buy-off.
    • Direct contact with customer buyers and engineers. R&D development, cost and price analysis, and the related negotiations.
    IndustrialisationQCDCustomer relationshipCost and price analysis

Expertise

Skills & education

Leadership

General managementP&L ownershipTeam management (up to 150 people, 40 in matrix)Coaching of managers and project leadersMulticultural leadership (France, China, Vietnam)M&A divestment: due diligence, negotiation, closingPost-acquisition integrationChange management
All skills (14)
Scaling a small business onto processes and systemsTeam building and team spiritEmployee shareholding governanceBusiness plan, budgets and performance dashboardsCommercial repositioning and value-based development pricingLaunching an adjacent business line

Operations and industry

Manufacturing operationsAutomotive Tier 1 (stamping, welding)Soft goods manufacturingLean: QRQC, 8D, Kaizen, 5S, SMEDIndustrialisation and product/process buy-offTechnical cost reductionSocial compliance and standards: BSCI, ISO 9001, WRAP and SA8000 requirementsAutomotive quality requirements: IATF 16949, OEM supplier audits such as ASES (Renault and Nissan)
All skills (18)
Product engineering and sourcing in Asia: injection-moulded parts, foam, fitted casesSAP ERP migration of acquired plantsInnovation management (hot stamping, IoT, AGV)Prototype developmentSupplier and customer relationship (Nissan, Renault, Faurecia, Valeo)Technical bags: defense, outdoor, industrial, medicalB2B buyer development and trade showsDesign to Cost and Design for ManufacturingSkills matrix and training plansSewing-line balancing in labour-intensive production

Tools and methods

KPI-driven managementCAPEX and tooling budgetsCosting and cost-structure modelsSAPERP and BI dashboardsProject managementDigital transformationAI-assisted workflows with human approval
All skills (15)
Finance analyticsData-driven management and KPI reviewsCRM and PLM deploymentSEO and AEO (answer-engine optimisation)Lead qualificationLead-management workflow with AI-assisted data captureShop-floor IoT sensors and machine-intensity data

Languages and cultures

French (native)English (fluent)Spanish (good working level)Chinese business culture: five years leading teams in China (not a Chinese speaker)Japanese business culture (Nissan and Japanese partners, Waseda residency)International exposure: Mexico (studies), UK, Russia and Japan (customer projects), USA and Singapore (MBA residencies)

Education

Executive MBA, Highly Commended
University of Mannheim (Mannheim Business School) & ESSEC Business School, 2019
Strategic project: SIO Energy, a battery back-up service for small businesses on an unreliable grid in Nairobi, tested with a minimum viable product in Kenya. Residencies in Washington DC, Singapore and Tokyo.

Master's degree in Engineering (General Mechanics)
ENIM – École Nationale d'Ingénieurs de Metz, 2004

International Business Certificate
Tecnológico de Monterrey, 2003

Figures

Financial results can be shared in confidence in a conversation.